According to the item in a building divided by 100% in the BOQ?
1. Structure = 35%
2. Brick work = 6%
3. Woodwork = 5%
4. Metal work = 2%
5. Plumbing and Sanitary = 6%
6. Electrical work = 7%
7. Plaster work = 4%
8. General Floor Tiles work = 6%
9. Toilet & Kit wall Tiles work = 3%
10. Aluminum work = 4%
11. EME (Lift Generator, Substation) =10%
12. Paintwork = 3%
13. Other civil work = 6%
14. Utility connection & Bill = 3%
Total = 100%