How are all the items in a building divided by 100% in BOQ?

 

According to the item in a building divided by 100% in the BOQ?

1. Structure = 35%

2. Brick work = 6%

3. Woodwork = 5%

4. Metal work = 2%

5. Plumbing and Sanitary = 6%

6. Electrical work = 7%

7. Plaster work = 4%

8. General Floor Tiles work = 6%

9. Toilet & Kit wall Tiles work = 3%

10. Aluminum work = 4%

11. EME (Lift Generator, Substation) =10%

12. Paintwork = 3%

13. Other civil work = 6%

14. Utility connection & Bill = 3%

Total = 100% 