As 6% of the total building cost only goes to BRICK WORK, I will break down this 6% to make you understand clearly.

  Here’s a detailed breakdown of the  6% Brick Work allocation  in the BOQ, divided by typical percentage allocations within that Brick work cost. This breakdown may vary depending on the building design and project requirements, but it generally aligns as follows:      ✪ BRICK WORK ~ 6%           - GF Brick work = 6%           - 1st floor Brick work = 18%           - 2nd floor Brick work = 18%           - 3rd floor Brick work = 18%           - 4th floor Brick work = 18%           - 5th floor Brick work = 18%           -Roof Top Brick work = 4%             TOTAL = 100% ( 6 % How it will be. )

Estimated Per-Square-Foot Cost Steel Factory Shed

  Estimated Per-Square-Foot Cost Breakdown for a 60,000 sq. ft. Steel Factory Shed: Steel Structure (Columns, Beams, Trusses) : For a standard industrial-grade steel structure, costs can range from BDT 1,000-1,500 per sq. ft. for larger structures like this. Roof and Wall Cladding : Metal sheets or PEB panels for roofing and walls cost about BDT 150-250 per sq. ft. Foundation : For a large shed with basic foundation requirements, costs may range around BDT 100-150 per sq. ft. Flooring : A reinforced concrete floor to withstand industrial use costs approximately BDT 200-300 per sq. ft. Utilities and Installation : Labor, lighting, basic electrical setup, and ventilation typically add BDT 50-100 per sq. ft. Per-Square-Foot Total Estimate: Adding these up, the per-square-foot cost is approximately: Low Range : BDT 1,500-1,700 per sq. ft. High Range : BDT 2,000-2,300 per sq. ft. Total Estimated Cost for 60,000...

The Building consists of two major parts

The Building consists of two major parts (a) substructure (b) superstructure. All components of buildings fall under any one of these categories. Substructure: The structure below the ground level is known as the foundation or substructure. The foundation forms the base which transmits the load from the superstructure to the soil below. The foundation should be properly designed and carefully executed, both from the point of view of the stability and cost of the structure. Superstructure: The structure above the ground level is known as the superstructure. The various components constituting the superstructure are explained under. Basement: The story or floor of a building below ground level. This is not used for residential purposes. It is generally used for storage of goods, air-conditioning rooms, vehicle parking, and as a locker for banks, etc. Plinth: The portion of a structure between the surface of the surrounding ground and the surface of the floor, which is immediately above t...

According to National Building Code, buildings are classified based on occupancy and types of construction.

 According to the National Building Code, buildings are classified based on occupancy and types of construction. 1. Classification based on type of occupancy a) Group A: Residential Buildings b) Group B: Educational Buildings c) Group C: Institutional Buildings d) Group D: Assembly Buildings e) Group E: Business Buildings f) Group F: Mercantile Buildings g) Group G: Industrial Buildings h) Group H: Storage Buildings i) Group J: Hazardous Buildings Residential Buildings: These are buildings in which sleeping accommodation is provided for normal residential purposes, with or without cooking or dining or both facilities. These buildings are further subdivided into 5 groups, viz.  A-1: Lodging house  A-2: Family private dwelling; A-3:Dormitories; A-4: Flats (Apartment Houses); A-5: Hotels. Educational Buildings: All those buildings which are meant for education from a nursery to the University, are included in this group. However, the National Building Code of India recommend...

As 35% of the total building cost only goes to structural, I will break down this 35% to make you understand clearly.

  Here’s a detailed breakdown of the 35% structure allocation in the BOQ, divided by typical percentage allocations within that structure cost. This breakdown may vary depending on the building design and project requirements, but it generally aligns as follows: Item Percentage of Structure (35%) Explanation Foundation Work 10% of 35% (3.5%) Covers excavation, footings, piles, slab on grade, waterproofing, etc. Structural Framework 40% of 35% (14%) Includes columns, beams, slabs, reinforcement, concrete, bracing, etc. Walls and Partitioning 20% of 35% (7%) Masonry work for walls, load-bearing walls, internal partitions, etc. Roof Structure 15% of 35% (5.25%) Covers trusses, rafters, roof slabs, waterproofing, and drainage provisions Structural Finishes 10% of 35% (3....

How are all the items in a building divided by 100% in BOQ?

  According to the item in a building divided by 100% in the BOQ? 1. Structure = 35% 2. Brick work = 6% 3. Woodwork = 5% 4. Metal work = 2% 5. Plumbing and Sanitary = 6% 6. Electrical work = 7% 7. Plaster work = 4% 8. General Floor Tiles work = 6% 9. Toilet & Kit wall Tiles work = 3% 10. Aluminum work = 4% 11. EME (Lift Generator, Substation) =10% 12. Paintwork = 3% 13. Other civil work = 6% 14. Utility connection & Bill = 3% Total = 100%   If you like this post, please like and share it to encourage others to see it.

Are you thinking of building a long-lasting modern home?

Image
 Are you thinking of building a long-lasting modern home? Trust an experienced engineer, stay safe yourself and ensure that others live safely. We design each project by analyzing it with ETABS / SAFE Software by an experienced structural engineer in accordance with the BNBC -2020 code and keeping it in Seismic Load Consideration. We also have an experienced Civil Engineer, Architect team. By ensuring the proper use of land, your dream home is attractive, beautiful and safe. Our Services: "Union Parishad, Municipality Plan Approval" "Architectural Design" "Structural Design" "Plumbing Design" "Electrical Design" "Estimate and Casting" "B&Q" "3D" "Soil Investigation and Digital Survey" "Construction" "Retrofitting" "Project Management" "Site Supervision" For any need, contact our page or call directly on this number 𝐏𝐡𝐨𝐧𝐞 & 𝐖𝐡𝐚𝐭𝐬𝐀𝐩𝐩 𝐍𝐮...